当前位置:Home » Q&A » Common Installation Method of Electromechanical Equipment

Common Installation Method of Electromechanical Equipment

管理员:煜科管理
人气:540发表时间:2017-06-01 10:37

The mechanical and electrical equipment installation project needs to have the power source and the power source, as well as hoisting the hoisting equipment such as winch and derrick. In order to shorten the construction period, the order of installation of the equipment should be arranged, and the construction of each step should be scientifically demonstrated. 

In mechanical and electrical equipment installation project construction plan, should consider various factors, the analysis of the actualoperability of installation techniques and methods, and guided by the modern science and technology, make after you should not to change it. On the hoist,the derrick, compressor and substation after the arrangement of the scientificand reasonable installation order, to ensure that project have order, and ensure the construction progress of installation. For the installation of any equipment, shall be based on the corresponding technical requirements forinstallation construction, not only can ensure the installation quality, and can reduce the consumption of materials and the passing of time. 

The construction supervision of the installation of electromechanical equipment shall be strengthened, and the construction units shall be required strictly according to the drawings, so as to ensure the quality of the installation. In the electrical and mechanical equipment installation process, should pay attention to the auxiliary equipment of mechanical and electrical equipment,components, and operator inspection, arrange the specialist at the constructionsite operations electrical and mechanical equipment installation work,according to the safety regulations set safety protection measures, participatein the installation of construction personnel must wear safety helmet, and is established on the basis of good installation order. 

To participate in the installation of mechanical and electrical equipment of mechanical and electrical work, should strengthen the related technical training, so that can be familiar with mechanical and electrical equipment installation standardand knowledge, to ensure the quality of installation engineering construction. Participatein the installation of mechanical and electrical equipment of electrician,shall be based on the design requirements of node, the access control panelbefore installation and equipment switch, in through the back check the operation condition of equipment, otherwise may cause the equipment can not connectto normal in place, lifting machines cannot be put right.